Search results for "Nuclear decommissioning"
showing 5 items of 5 documents
Key EU DEMO plant and building layout criteria
2021
Abstract An early attention to the layout of both plant site and its buildings is essential in a complex plant under preliminary design as DEMO in order to meet the assigned targets, namely i) the licensing requirements ii) a good availability in delivery electricity to the grid. The layout definition has to follow several criteria that become more complex and stringent for nuclear buildings, e.g. functional, maintenance, fire protection, safety, human factors, shielding, and remote handling. The criterion As Low As Reasonable Achievable, with respect to the dose to the staff, has to be applied in design, operation, maintenance and decommissioning phases. The tokamak building, where several…
Life-Cycle Land-Use Requirement for PV in Vietnam
2021
Over the last 15 years, photovoltaics (PV) in Vietnam has experienced development. The increased installed capacity of PV requires more land for installation sites as well as for manufacturing the plants’ component and waste treatment during the plants’ decommissioning. As a developing country, in which more than 80% of the population’s livelihood depends on agriculture, there are concerns about the competition of land for agriculture and solar development. This paper estimates the life-cycle land-use requirement for PV development in Vietnam, to provide the scientific-based evidence for policy makers on the quantity of land required, so that the land budget can be suitably allocated. The d…
New solutions for prefabricated secondary substations in the view of sustainability
2016
The secondary substations will assume an important role as “smart nodes” of the smart grid. So in few years there will be a widespread dissemination on the territory of this apparatus. Consequently, great care have to be taken not only on safety issues, but also on the constructive methodology, in order to determine low environmental impact and decommissioning cost. This paper focuses on innovative solutions for the realization of prefabricated secondary substations, in the direction of sustainability. Innovative layout and enclosure topologies have been here taken into account. In particular, by considering that the substation concrete box is, at the same time, uneconomical and with strong…
Composite Material Recycling Technology—State-of-the-Art and Sustainable Development for the 2020s
2021
Recently, significant events took place that added immensely to the sociotechnical pressure for developing sustainable composite recycling solutions, namely (1) a ban on composite landfilling in Germany in 2009, (2) the first major wave of composite wind turbines reaching their End-of-Life (EoL) and being decommissioned in 2019–2020, (3) the acceleration of aircraft decommissioning due to the COVID-19 pandemic, and (4) the increase of composites in mass production cars, thanks to the development of high volume technologies based on thermoplastic composites. Such sociotechnical pressure will only grow in the upcoming decade of 2020s as other countries are to follow Germany by limiting and ba…
Composite Material Recycling Technology – State-of-the-Art and Sustainable Development for the 2020s.
2020
Recently, significant events took place that added immensely to the sociotechnical pressure for developing sustainable composite recycling solutions, namely (1) a ban on composite landfilling in Germany in 2009, (2) the first major wave of composite wind turbines reaching their End-of-Life (EoL) and being decommissioned in 2019–2020, (3) the acceleration of aircraft decommissioning due to the COVID-19 pandemic, and (4) the increase of composites in mass production cars, thanks to the development of high volume technologies based on thermoplastic composites. Such sociotechnical pressure will only grow in the upcoming decade of 2020s as other countries are to follow Germany by limiting and ba…